000 | 00807nam-a2200241---4500 | ||
---|---|---|---|
001 | 242779 | ||
005 | 20200804145327.0 | ||
010 |
_a0-8213-5942-8 _bBrochado |
||
090 | _a242779 | ||
100 | _a20050216d2005 k y0pory5003 ba | ||
101 | 0 | _aeng | |
102 | _aUS | ||
200 | 1 |
_aMaking a large irrigation scheme work _ea case study from Mali _fDjibril Aw, Geert Diemer |
|
210 |
_aWashington _cThe World Bank _dcop. 2005 |
||
215 |
_aXX, 156 p. _cil. _d23 cm |
||
225 | 2 | _aDirections in development | |
675 |
_a338.1(662.1) _vmed _zpor |
||
675 |
_a626.8 _vmed _zpor |
||
700 | 1 |
_aAw, _bDjibril |
|
701 | 1 |
_9206422 _aDiemer, _bGeert _4070 |
|
712 | 0 | 2 |
_aThe World Bank _4650 |
942 |
_cLIVRO _n0 |