No cover image available
Normal view MARC view ISBD view

Measurement of total pressure and water pressure on the tunnel lining of the premetro tunnel under the river scheldt at antwerp = Mesure des pessions totales et des pressions interstitielles derrère le revêtement du tunnel prémétro en-dessous de l'escaut à anvers / E. Hemerijckx, H. Raedschelders, P. de Schrijver

Main Author Hemerijckx, E. Coauthor Raedschelders, H.
Schrijver, P. de
Country Bélgica. Publication S.l. : s.n., 1989 Description p. 243-252 ; 24 cm CDU 624.19
Tags from this library: No tags from this library for this title. Log in to add tags.
    average rating: 0.0 (0 votes)
Holdings
Item type Current location Call number Status Date due Barcode Item holds
Monografia Biblioteca da UMinho no Campus de Azurém
BPG3 624.19 - H Available 337627
Total holds: 0

Separata de: Proceedings of the International Conference on Tunnelling and Micro-Tunnelling in Soft Ground, Paris, 1989

There are no comments for this item.

Log in to your account to post a comment.